Scanweld Group is a privately owned company, established in 1988.

Today our main market area is Scandinavian and Baltic countries.

The turnover is about 10 million euros.

Scanweld Group has about 150 workers.

The company has:
- Quality system following the ISO 9001 standard (under process)
- The welding control group is lead by our own European welding engineer including two European welding specialists.

- In addition to companys EN 288 certificate, each welder has EN 287 certificate
- Environmental policy
- Drug policy with 0-tolerance
- Safety policy

References:

  1. Nybit Ltd. (Mr.Indrek Tepp +3725048684) Terminal in Muuga Harbour (1993-2004 - 960 000e)

    -pipelines
    -metalconstructions, pipesupports and bridges
    -tank for oil 1400m3
    -equipment installation
    -loading and unloading station
    -bitumen-emulsion plant; emulsion tanks 2 x 125m3
    -concrete fundamentations

  2. Sonmarin Ltd. Oiltanking (Mr.Ingmar Norrback +358 400286113) Terminal in Muuga Harbour (1993-2003 - 770 000e)

    -pipelines (carbon- and stainless steel)
    -metalconstructions
    -tank 5000m3
    -pump- and boilerhouse with equipment
    -floating roof for tank 8500m3
    -pressure vessels
    -filters
    -concrete fundamentations
    -loading and unloading station
    -repair of tanks

  3. Eesti Gaas (1995-2004 - 1 150 000e)

    -Karksi gas measuring station (high pressure)
    -Kohila gas supply (high pressure)
    -Saku gas supply (high and low pressure)
    -Kiiu boilerhouse gas supply
    -Humala-Rocca al-Mare gas supply
    -Tallinn GJJ reconstruction
    -AS Baltex 2000 gaspipeline
    -AS Astarta gaspipeline
    -AS Saksa Auto gaspipeline
    -Mustamäe boilerhouse, boiler Nr.8 gas supply
    -Loo GJJ reconstruction
    -Maardu gas regulateterminal reconstruction
    -Viimsi gas supply

  4. Transoil Eesti AS, (Mr.Jüri Petter +3725048216) Terminal Expansion in Muuga Harbour (1997-1998 - 640 000e)

    -tank 10000m3 with floating roof
    -pump and technological pipelines
    -equipment and installation
    -sandblasting and painting

  5. Iru Power Plant (Mr.Rein Kriis +372 625 3222) (1998 - 2004 - 1 530 000e)

    -Gas pipelines and conversion to the natural gas fuel and additional automatisation on the basis of computer system "Damatic XD" of water boiler KVGM-100 and steam boiler TGME-464, electrical installation and digital control systems (Valmet OY)
    -fire-fighting systems

  6. Milstrand AS, Terminal in Viimsi (2000-2001 - 1 280 000e, 750 t)

    -tanks 3 x 10 000m3 with floating roofs
    -pipelines
    -pumphouses

  7. Galvex Estonia OÜ, Galvanizing facility in Muuga Port (2002 - 1 280 000e)

    -installation of technological pipelines

  8. Foster Wheeler OY, Balti and Eesti Power Plant (2002-2004 - 770 000e)

    -flue gas service platforms
    -conveyer montage
    -pipelines and equipments

  9. Trendgate AS, Mr. Toomas Saks +372 56647241 (2004 - 21 090 000e)

    -tanks for diesel oli 2 X 5 000m3
    -tanks for fuel oil and oli 6 X 30 000m3
    -pipeline DN900 manufacturing 9,7 km
    -railway estacade
    -pumphouse and manifolding
    -raw oil tankpit area
    -diesel tankpit - car loading