Scanweld Group is a privately owned company, established in 1988.
Today our main market area is Scandinavian and Baltic countries.
The turnover is about 10 million euros.
Scanweld Group has about 150 workers.
- The welding control group is lead by our own European welding engineer including two European welding specialists.
- In addition to companys EN 288 certificate, each welder has EN 287 certificate
Nybit Ltd. (Mr.Indrek Tepp +3725048684) Terminal in Muuga Harbour (1993-2004 - 960 000e)
-pipelines
-metalconstructions, pipesupports and bridges
-tank for oil 1400m3
-equipment installation
-loading and unloading station
-bitumen-emulsion plant; emulsion tanks 2 x 125m3
-concrete fundamentations
Sonmarin Ltd. Oiltanking (Mr.Ingmar Norrback +358 400286113) Terminal in Muuga Harbour (1993-2003 - 770 000e)
-pipelines (carbon- and stainless steel)
-metalconstructions
-tank 5000m3
-pump- and boilerhouse with equipment
-floating roof for tank 8500m3
-pressure vessels
-filters
-concrete fundamentations
-loading and unloading station
-repair of tanks
Eesti Gaas (1995-2004 - 1 150 000e)
-Karksi gas measuring station (high pressure)
-Kohila gas supply (high pressure)
-Saku gas supply (high and low pressure)
-Kiiu boilerhouse gas supply
-Humala-Rocca al-Mare gas supply
-Tallinn GJJ reconstruction
-AS Baltex 2000 gaspipeline
-AS Astarta gaspipeline
-AS Saksa Auto gaspipeline
-Mustamäe boilerhouse, boiler Nr.8 gas supply
-Loo GJJ reconstruction
-Maardu gas regulateterminal reconstruction
-Viimsi gas supply
Transoil Eesti AS, (Mr.Jüri Petter +3725048216) Terminal Expansion in Muuga Harbour (1997-1998 - 640 000e)
-tank 10000m3 with floating roof
-pump and technological pipelines
-equipment and installation
-sandblasting and painting
Iru Power Plant (Mr.Rein Kriis +372 625 3222) (1998 - 2004 - 1 530 000e)
-Gas pipelines and conversion to the natural gas fuel and additional automatisation on the basis of computer system "Damatic XD" of water boiler KVGM-100 and steam boiler TGME-464, electrical installation and digital control systems (Valmet OY)
-fire-fighting systems
Milstrand AS, Terminal in Viimsi (2000-2001 - 1 280 000e, 750 t)
-tanks 3 x 10 000m3 with floating roofs
-pipelines
-pumphouses
Galvex Estonia OÜ, Galvanizing facility in Muuga Port (2002 - 1 280 000e)
-installation of technological pipelines
Foster Wheeler OY, Balti and Eesti Power Plant (2002-2004 - 770 000e)
-flue gas service platforms
-conveyer montage
-pipelines and equipments
Trendgate AS, Mr. Toomas Saks +372 56647241 (2004 - 21 090 000e)
-tanks for diesel oli 2 X 5 000m3
-tanks for fuel oil and oli 6 X 30 000m3
-pipeline DN900 manufacturing 9,7 km
-railway estacade
-pumphouse and manifolding
-raw oil tankpit area
-diesel tankpit - car loading